Victoriacaulder4
Victoriacaulder4 Victoriacaulder4
  • 04-10-2021
  • History
contestada

What are the risks involved in choosing to build within one kilometer of a site such as Teotihuacan?

Respuesta :

zarampa
zarampa zarampa
  • 04-10-2021

Answer:

Explanation:

The risk is the cancellation of construction due to the high possibility of an anthropological find.

Another risk is the protests of people who feel offended by an alleged invasion of an ancestral territory.

Answer Link

Otras preguntas

Cutting down forests changes the populations of more than trees. Imagine the organisms that lived in this forest. After the trees have been cut, fewer animals c
There are 5 fish in a tank 2 die how many are left
Number 35 is the question I need help with
What is common to all cells?
en un juego de ____ hay dos tenistas y en un juego de ____hay cuatro
0 As shown in the diagram below, M, R, and T aremidpoints of the sides of ABC.If AB = 18, AC = 14, and BC = 10, what is theperimeter of quadrilateral ACRM?1) 3
How did the relationship between the United States and France influence these alien and sedition acts?
A flock of 20 seagulls merges with a flock of cardinals. The new flock is bigger than either of the original ones, but still, it is no larger than 100 birds. Ho
!!!!!!!!!!!!!!!!!!!!​
i honestly dont understand math but i need to pass so please help​