sarweston8136 sarweston8136
  • 03-06-2022
  • Business
contestada

Higher cash flows earlier in a project's life are Blank______ valuable than higher cash flows later on.

Respuesta :

Parrain
Parrain Parrain
  • 06-06-2022

When we get higher cashflows in a projects life at an earlier period, these are more valuable than later on.

Why are earlier cashflows more valuable?

When we receive higher cashflows earlier on in a project's life, the discounted values of these cashflows will be higher.

This is as opposed to receiving them later on where the discounted values will be lower on account of there being a longer period to discount over.

Find out more on discounted values of cashflows at https://brainly.com/question/18957458.

#SPJ4

Answer Link

Otras preguntas

how effective do you find the predictable ,parallel structure of the poem in communicating a message about human nature?support your response with exampled frlm
Hook sentence on why overcoming obstacles is important
What percentage of £1 is 23p?​
what would be the orbital velocity of a polar satellite at a height of 4200 km
Solve the equations. \sqrt(y^(4)+2y^(2)+1)=y^(2)+1
write a 2 sentence paragraph about how jealousy effects siblings
Right angle measurement
Explain how the author reveals the difference between the children’s views of their parents working and the view adults have about being working parents in the
A race car travels in a straight line from the starting line to the finish line in 12.0 seconds. The race car accelerated from a stopped position to 90 m/s by t
2 exponet 3 - (8+4) + 1 = 2 exponet 3 - blank +1 add